Complete Package Project | Electrical + HVAC + Fire
Our ability to provide full solutions across Electrcial, HVAC and fire services saw us complete this school project alongside Marra Construction. With Ohope Beach School remaining in full day-to-day operations during the construction works, this project required detailed and careful phrasing of the works which head contractor Marra Construction did seamlessly for all involved.
This was a crucial element for all parties involved and meant that we needed to be on our game to ensure efficient service delivery to the main contractor. The project saw the construction of a new two-storey building of approximately 1500 m2 plus a high-level walkway connection to the existing (remaining) teaching block.
Project Summary: The Ohope Beach school project saw the AMP'T team complete the commercial installation for the new school buildings providing electrical, data, security, access control and HVAC installation across the project. The end result was both well executed and created a fantastic environment for future generations.
Construction by: https://www.marraconstruction.co.nz
Comments